Bondada Engineering has acquired a number of orders from the Adani Group aggregating to ₹469 crore for the execution of the Stability of System (BOS) package deal for a 250 MW Photo voltaic Energy Undertaking at Khavda, Kutch, Gujarat.
The orders have been awarded by Adani Inexperienced Vitality and Adani Inexperienced Vitality Six and contain the availability of products and on-site providers for the BOS package deal. The undertaking is scheduled to be executed inside eight months from the receipt of the order.
With this newest order win, Hyderabad-based Bondada Engineering’s cumulative undertaking capability with Adani Group has reached about 1GW, additional strengthening its place in Bharat’s quickly increasing renewable vitality infrastructure sector.
“This order reinforces our sturdy and rising partnership with the Adani Group and displays the belief positioned in Bondada Engineering’s execution capabilities within the renewable vitality sector. As Bharat accelerates its clear vitality transition, we stay dedicated to delivering high-quality infrastructure options that contribute meaningfully to the nation’s renewable vitality ambitions,’’ Bondada Raghavendra Rao, Chairman & Managing Director, Bondada Group, mentioned in a launch.
Revealed on Might 18, 2026
Source link
#Bondada #Engineering #bags #orders #worth #469cr #Adani #Group


